The NZ Herald Buildings project
Discover how Yakka successfully managed the complex demolition of five multi-levelled buildings in the heart of Auckland CBD, showcasing our expertise in challenging urban environments.

Complex demolition in the city centre
Inner-city multi-storey asbestos removal and demolition, Auckland CBD
We safely removed asbestos and demolished five multi-storey buildings (5–12 floors) positioned directly on inner‑city footpaths in Auckland’s CBD. Working within tight footprints and high pedestrian zones, Yakka delivered a staged, low‑disruption program that met all compliance requirements.
Highlights:
- Scope: Asbestos abatement and demolition of five buildings, 5–12 levels
- Location: CBD sites on footpath demarcation lines
- Approach: Staged dismantling, strict controls, public interface management
- Outcome: Safe, compliant, on-time completion backed by Yakka’s inner‑city demolition expertise

Navigating unique project challenges
NZ Herald Buildings — Zero‑disruption abatement and demolition
We planned and delivered works to avoid disruption to neighbouring businesses and the public. During investigation we identified friable asbestos both inside and on the façade. One eight‑storey block was fully scaffolded and shrink‑wrapped to create a sealed work zone.
What we did:
- Comprehensive staging and traffic/pedestrian management
- Full enclosure, negative‑pressure controls, and independent air monitoring
- Sequenced abatement and dismantling to maintain business continuity
- Continuous stakeholder communication and compliance reporting
Outcome:
- Safe, compliant delivery with minimal public impact and no unplanned closures.

Yakka's role and innovative solutions
Head contractor delivery — safe, continuous access, precision demolition
Yakka served as head contractor, managing end‑to‑end delivery. We maintained public safety and access by installing a footpath gantry with protective scaffolding overhead, keeping pedestrians moving throughout demolition.
How we executed:
- Central plant strategy: Positioned a 250‑tonne crawler crane within the building footprint
- Cut‑and‑crane method: Systematically lifted sections to reduce height to safe levels
- Final removal: High‑reach excavators completed the demolition under controlled conditions
- Public interface: Gantry and scaffold protection ensured continuous pedestrian access and safety
Result: A tightly controlled, low‑disruption demolition completed to specification.
Choose Yakka for your next complex project
Proven inner‑city demolition, delivered safely and on time
The NZ Herald Buildings project showcases our ability to manage complex, multi‑stage demolition in a live CBD environment. Through rigorous planning, tight safety controls, and clear stakeholder coordination, we delivered on program with zero major disruptions—earning repeat work from the client across multiple subsequent projects.
Why partner with Yakka:
- Expert planning for high‑risk, inner‑city sites
- Robust safety systems and compliance
- On‑time delivery with minimal public impact
- Trusted by repeat clients
Have a challenging project? Choose Yakka for safe, precise delivery.